Construction of new Power Station Forsthaus Bern
The new Power Station Forsthaus Bern is made up of a 50-m high waste bunker, a 300-m long industrial hall up to 45 m in height and a 70-m high prefabricated Tower.
With the exception of the subconstruction for the air condensers, the supporting structures are concrete constructions and were reduced to the minimum required supporting load-bearing elements in order to ensure maximum flexibility. Whereas the high walls of the waste bunker, which act as panels, were constructed of in-situ concrete, prefabricated concrete ele-ments were used for the wide-span floor slabs and the high façades of the main office and of the tower.
DEVELOPMENT PERIOD
2008 to 2012
CLIENT
Energie Wasser Bern ewb, Bern
ARCHITECTURE
Graber Pulver Architekten AG, Zürich
FUNCTION WITHIN PROJECT
Development of the support structure, foundation and foundation pit from concept to completion